{"id":6759,"date":"2026-03-24T21:14:27","date_gmt":"2026-03-24T21:14:27","guid":{"rendered":"https:\/\/ruwark.com\/blog\/?p=6759"},"modified":"2026-03-24T21:14:29","modified_gmt":"2026-03-24T21:14:29","slug":"requisitos-pmar-sin-infraestructura-preexistente-guia-completa-2026","status":"publish","type":"post","link":"https:\/\/ruwark.com\/blog\/requisitos-pmar-sin-infraestructura-preexistente-guia-completa-2026\/","title":{"rendered":"Requisitos PMAR sin Infraestructura Preexistente: Gu\u00eda Completa 2026"},"content":{"rendered":"\n<!--\n  ============================================================\n  BLOG 45 \u2014 Requisitos PMAR sin Infraestructura (2026)\n  ============================================================\n  CONFIGURACI\u00d3N RANK MATH:\n  - Focus Keyword: requisitos PMAR sin infraestructura preexistente\n  - Meta Title: Requisitos PMAR sin Infraestructura (2026)\n  - Meta Description: Conoce los requisitos PMAR sin infraestructura preexistente seg\u00fan Art. 27.15 del RIA. Solicitud, info t\u00e9cnica, plano y plazo de 10 d\u00edas h\u00e1biles.\n  - Slug: requisitos-pmar-sin-infraestructura\n  - URL: https:\/\/ruwark.com\/blog\/requisitos-pmar-sin-infraestructura\/\n-->\n\n<script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@graph\": [\n    {\n      \"@type\": \"Article\",\n      \"headline\": \"Requisitos PMAR sin Infraestructura (2026)\",\n      \"description\": \"Conoce los requisitos PMAR sin infraestructura preexistente seg\u00fan Art. 27.15 del RIA. Solicitud, info t\u00e9cnica, plano y plazo de 10 d\u00edas h\u00e1biles.\",\n      \"author\": { \"@type\": \"Organization\", \"name\": \"RUWARK S.A.C.\", \"url\": \"https:\/\/ruwark.com\" },\n      \"publisher\": { \"@type\": \"Organization\", \"name\": \"RUWARK S.A.C.\", \"url\": \"https:\/\/ruwark.com\" },\n      \"datePublished\": \"2026-03-22\",\n      \"dateModified\": \"2026-03-22\",\n      \"mainEntityOfPage\": \"https:\/\/ruwark.com\/blog\/requisitos-pmar-sin-infraestructura\/\"\n    },\n    {\n      \"@type\": \"FAQPage\",\n      \"mainEntity\": [\n        {\n          \"@type\": \"Question\",\n          \"name\": \"\u00bfCu\u00e1l es el plazo para la autorizaci\u00f3n del PMAR sin infraestructura?\",\n          \"acceptedAnswer\": { \"@type\": \"Answer\", \"text\": \"El plazo es de 10 d\u00edas h\u00e1biles contados desde el d\u00eda h\u00e1bil posterior a la presentaci\u00f3n de la solicitud, conforme al art\u00edculo 27.16 del RIA. El procedimiento se sujeta a silencio administrativo negativo.\" }\n        },\n        {\n          \"@type\": \"Question\",\n          \"name\": \"\u00bfQu\u00e9 documentos administrativos se necesitan para el PMAR?\",\n          \"acceptedAnswer\": { \"@type\": \"Answer\", \"text\": \"Se requiere: solicitud con datos generales, declaraci\u00f3n jurada del director y residente, DJ del titular, acreditaci\u00f3n de titularidad del terreno y constancia de pago de la tasa ante la DDC competente, conforme al Art. 27.15.\" }\n        },\n        {\n          \"@type\": \"Question\",\n          \"name\": \"\u00bfQu\u00e9 debe incluir la informaci\u00f3n t\u00e9cnica del PMAR?\",\n          \"acceptedAnswer\": { \"@type\": \"Answer\", \"text\": \"Nombre del proyecto, procedencia seg\u00fan Art. 27.12, tipo de obra, ubicaci\u00f3n, descripci\u00f3n t\u00e9cnica del PMAR, extensi\u00f3n del \u00e1rea, personal del proyecto, cronograma detallando labores con remoci\u00f3n de suelos, duraci\u00f3n y distribuci\u00f3n de frentes.\" }\n        },\n        {\n          \"@type\": \"Question\",\n          \"name\": \"\u00bfCu\u00e1ndo se requiere el plano de obras programadas?\",\n          \"acceptedAnswer\": { \"@type\": \"Answer\", \"text\": \"Solo cuando el proyecto es colindante, tiene cruce a\u00e9reo o pasa por subsuelo de un Bien Integrante del Patrimonio Cultural de la Naci\u00f3n (BIP). Este plano complementa al plano perim\u00e9trico obligatorio.\" }\n        },\n        {\n          \"@type\": \"Question\",\n          \"name\": \"\u00bfQu\u00e9 diferencia al PMAR sin infraestructura del PMAR con infraestructura preexistente?\",\n          \"acceptedAnswer\": { \"@type\": \"Answer\", \"text\": \"El PMAR sin infraestructura se tramita en 10 d\u00edas h\u00e1biles con los requisitos base del Art. 27.15. El PMAR con infraestructura preexistente requiere documentaci\u00f3n gr\u00e1fica adicional (fotograf\u00edas, im\u00e1genes satelitales) y tiene un plazo de 20 d\u00edas h\u00e1biles (Art. 27.17-27.18).\" }\n        }\n      ]\n    }\n  ]\n}\n<\/script>\n\n<style>\n    \/* ===== RUWARK BLOG BASE ===== *\/\n    .ruwark-blog-container{font-family:'Roboto','Segoe UI',Helvetica,Arial,sans-serif;line-height:1.75;width:100%;box-sizing:border-box;color:#e0e4eb;font-size:16px}.ruwark-blog-container *{box-sizing:border-box}.ruwark-blog-container .ruwark-card{background-color:#14203C;color:#FFFFFF;width:100%;border-radius:16px;overflow:hidden;box-shadow:0 15px 35px rgba(20,32,60,0.25);border-top:8px solid #FC4908;margin:0 auto}.ruwark-blog-container .ruwark-blog-header{padding:40px 40px 25px 40px;text-align:center;border-bottom:1px solid rgba(255,255,255,0.08)}.ruwark-blog-container .ruwark-blog-header .ruwark-category{display:inline-block;background-color:#FC4908;color:#fff;font-size:12px;font-weight:700;text-transform:uppercase;letter-spacing:1.5px;padding:4px 14px;border-radius:20px;margin-bottom:15px}.ruwark-blog-container .ruwark-blog-title{font-size:30px;font-weight:800;color:#FFFFFF;margin:0 0 15px 0;line-height:1.3}.ruwark-blog-container .ruwark-blog-meta{font-size:14px;color:#a0aec0;display:flex;justify-content:center;gap:20px;flex-wrap:wrap}.ruwark-blog-container .ruwark-blog-meta span{display:inline-flex;align-items:center;gap:5px}.ruwark-blog-container .ruwark-blog-body{padding:40px}.ruwark-blog-container .ruwark-toc{background-color:rgba(252,73,8,0.08);border:1px solid rgba(252,73,8,0.2);border-radius:12px;padding:25px 30px;margin-bottom:35px}.ruwark-blog-container .ruwark-toc-title{font-size:16px;font-weight:700;color:#FC4908;margin:0 0 12px 0}.ruwark-blog-container .ruwark-toc ol{margin:0;padding-left:20px}.ruwark-blog-container .ruwark-toc li{margin-bottom:6px;font-size:15px;color:#a0aec0;list-style:decimal}.ruwark-blog-container .ruwark-toc a{color:#a0aec0;text-decoration:none;transition:color 0.2s}.ruwark-blog-container .ruwark-toc a:hover{color:#FC4908}.ruwark-blog-container .ruwark-section{margin-bottom:35px}.ruwark-blog-container .ruwark-section-title{font-size:24px;font-weight:700;color:#FC4908;margin:0 0 15px 0;padding-bottom:10px;border-bottom:2px solid rgba(252,73,8,0.2);line-height:1.3}.ruwark-blog-container .ruwark-subsection-title{font-size:20px;font-weight:700;color:#FFFFFF;margin:25px 0 12px 0;line-height:1.3}.ruwark-blog-container p{font-size:16px;color:#e0e4eb;margin:0 0 15px 0;line-height:1.75}.ruwark-blog-container strong{color:#FFFFFF;font-weight:700}.ruwark-blog-container ul,.ruwark-blog-container ol{padding-left:22px;margin:0 0 15px 0;color:#d1d5db}.ruwark-blog-container li{margin-bottom:8px;font-size:15px;line-height:1.6}\n    .ruwark-blog-container .ruwark-tip-box{background-color:rgba(252,73,8,0.1);border-left:4px solid #FC4908;padding:18px 22px;border-radius:0 10px 10px 0;margin:20px 0}.ruwark-blog-container .ruwark-tip-box .tip-title{color:#FC4908;font-weight:700;font-size:15px;display:block;margin-bottom:6px}.ruwark-blog-container .ruwark-tip-box .tip-text{font-size:14px;color:#d1d5db}.ruwark-blog-container .ruwark-alert-box{background-color:rgba(231,76,60,0.1);border-left:4px solid #e74c3c;padding:18px 22px;border-radius:0 10px 10px 0;margin:20px 0}.ruwark-blog-container .ruwark-alert-box .alert-title{color:#e74c3c;font-weight:700;font-size:15px;display:block;margin-bottom:6px}.ruwark-blog-container .ruwark-alert-box .alert-text{font-size:14px;color:#d1d5db}.ruwark-blog-container .ruwark-success-box{background-color:rgba(46,204,113,0.1);border-left:4px solid #2ecc71;padding:18px 22px;border-radius:0 10px 10px 0;margin:20px 0}.ruwark-blog-container .ruwark-success-box .success-title{color:#2ecc71;font-weight:700;font-size:15px;display:block;margin-bottom:6px}.ruwark-blog-container .ruwark-success-box .success-text{font-size:14px;color:#d1d5db}.ruwark-blog-container .ruwark-table{width:100%;border-collapse:collapse;margin:20px 0;background-color:rgba(20,32,60,0.5);border-radius:8px;overflow:hidden}.ruwark-blog-container .ruwark-table th{background-color:rgba(252,73,8,0.2);color:#FC4908;font-size:14px;font-weight:700;padding:12px 16px;text-align:left}.ruwark-blog-container .ruwark-table td{border-bottom:1px solid rgba(255,255,255,0.05);padding:10px 16px;font-size:14px;color:#d1d5db;vertical-align:top}.ruwark-blog-container .ruwark-table tr:last-child td{border-bottom:none}.ruwark-blog-container .ruwark-faq{margin:35px 0}.ruwark-blog-container .ruwark-faq-item{background-color:rgba(255,255,255,0.03);border:1px solid rgba(255,255,255,0.06);border-radius:10px;padding:20px 24px;margin-bottom:12px;transition:background-color 0.2s}.ruwark-blog-container .ruwark-faq-item:hover{background-color:rgba(255,255,255,0.06)}.ruwark-blog-container .ruwark-faq-question{font-size:17px;font-weight:700;color:#FFFFFF;margin:0 0 10px 0;display:flex;align-items:flex-start;gap:10px}.ruwark-blog-container .ruwark-faq-question .q-icon{color:#FC4908;font-weight:800;flex-shrink:0}.ruwark-blog-container .ruwark-faq-answer{font-size:15px;color:#d1d5db;margin:0;padding-left:28px;line-height:1.7}.ruwark-blog-container .ruwark-cta{background:linear-gradient(135deg,#FC4908 0%,#e03d00 100%);border-radius:14px;padding:35px;text-align:center;margin:35px 0}.ruwark-blog-container .ruwark-cta .cta-title{font-size:22px;font-weight:800;color:#FFFFFF;margin:0 0 10px 0}.ruwark-blog-container .ruwark-cta .cta-text{font-size:15px;color:rgba(255,255,255,0.9);margin:0 0 20px 0}.ruwark-blog-container .ruwark-cta .cta-button{display:inline-block;background-color:#14203C;color:#FFFFFF;font-size:16px;font-weight:700;padding:14px 35px;border-radius:50px;text-decoration:none;transition:transform 0.2s,box-shadow 0.2s}.ruwark-blog-container .ruwark-cta .cta-button:hover{transform:translateY(-2px);box-shadow:0 8px 20px rgba(0,0,0,0.3)}.ruwark-blog-container .ruwark-sources{border-top:1px solid rgba(255,255,255,0.08);padding-top:25px;margin-top:35px}.ruwark-blog-container .ruwark-sources .sources-title{font-size:16px;font-weight:700;color:#a0aec0;margin:0 0 12px 0}.ruwark-blog-container .ruwark-sources ul{list-style:none;padding:0}.ruwark-blog-container .ruwark-sources li{font-size:13px;color:#718096;margin-bottom:6px;padding-left:16px;position:relative}.ruwark-blog-container .ruwark-sources li::before{content:'\u2192';position:absolute;left:0;color:#FC4908}.ruwark-blog-container .ruwark-sources a{color:#FC4908;text-decoration:none}.ruwark-blog-container .ruwark-sources a:hover{text-decoration:underline}.ruwark-blog-container .ruwark-blog-body a{color:#FC4908;text-decoration:none;border-bottom:1px solid rgba(252,73,8,0.3);transition:border-color 0.2s}.ruwark-blog-container .ruwark-blog-body a:hover{border-bottom-color:#FC4908}.ruwark-blog-container .ruwark-step{display:flex;gap:18px;margin-bottom:25px;align-items:flex-start}.ruwark-blog-container .ruwark-step .step-num{width:44px;height:44px;min-width:44px;background-color:#FC4908;color:#FFFFFF;border-radius:50%;display:flex;align-items:center;justify-content:center;font-weight:800;font-size:18px}.ruwark-blog-container .ruwark-step .step-body{flex:1}.ruwark-blog-container .ruwark-step .step-body .step-name{font-size:17px;font-weight:700;color:#FFFFFF;margin:0 0 6px 0;display:block}.ruwark-blog-container .ruwark-step .step-body p{margin:0;font-size:15px}@media(max-width:768px){.ruwark-blog-container .ruwark-blog-header{padding:30px 20px 20px 20px}.ruwark-blog-container .ruwark-blog-title{font-size:24px}.ruwark-blog-container .ruwark-blog-body{padding:25px 20px}.ruwark-blog-container .ruwark-section-title{font-size:20px}.ruwark-blog-container .ruwark-cta{padding:25px 20px}.ruwark-blog-container .ruwark-blog-meta{flex-direction:column;align-items:center;gap:8px}}\n\n    \/* ===== RUWARK SCHEMA BASE ===== *\/\n    .ruwark-schema-figure{margin:24px 0}\n    .ruwark-schema-img-hidden{position:absolute;width:0;height:0;overflow:hidden;clip:rect(0,0,0,0);border:0}\n    .ruwark-schema{border-radius:12px;overflow:hidden;border:1px solid rgba(252,73,8,0.2);background:linear-gradient(135deg,rgba(255,255,255,0.03),rgba(255,255,255,0.01)),#0f1930}\n    .ruwark-schema-header{background:rgba(252,73,8,0.1);padding:10px 18px;border-bottom:1px solid rgba(252,73,8,0.15);display:flex;align-items:center;gap:10px;flex-wrap:wrap}\n    .ruwark-schema-hbadge{font-size:10px;font-weight:800;letter-spacing:1px;text-transform:uppercase;color:#FC4908;background:rgba(252,73,8,0.15);padding:3px 10px;border-radius:20px;border:1px solid rgba(252,73,8,0.3);white-space:nowrap}\n    .ruwark-schema-htitle{font-size:13px;font-weight:700;color:#fff;line-height:1.3}\n    .ruwark-schema-body{padding:16px 18px}\n    .ruwark-schema-stats{display:flex;gap:10px;flex-wrap:wrap}\n    .ruwark-schema-stat{flex:1;min-width:80px;background:rgba(255,255,255,0.04);border-radius:8px;padding:12px 8px;text-align:center;border:1px solid rgba(255,255,255,0.06)}\n    .ruwark-schema-stat-num{font-size:24px;font-weight:900;color:#FC4908;line-height:1}\n    .ruwark-schema-stat-lbl{font-size:10px;font-weight:700;color:#d1d5db;text-transform:uppercase;letter-spacing:0.5px;margin-top:5px;line-height:1.3}\n    .ruwark-schema-checks{display:flex;flex-direction:column;gap:7px}\n    .ruwark-schema-check-row{display:flex;align-items:flex-start;gap:10px}\n    .ruwark-schema-check-icon{color:#2ecc71;font-size:13px;flex-shrink:0;margin-top:2px;font-weight:700}\n    .ruwark-schema-check-t{font-size:13px;color:#d1d5db;line-height:1.5}\n    .ruwark-schema-cols{display:grid;grid-template-columns:1fr 1fr;gap:10px}\n    .ruwark-schema-col{background:rgba(255,255,255,0.03);border-radius:8px;padding:12px;border:1px solid rgba(255,255,255,0.06)}\n    .ruwark-schema-col-head{font-size:10px;font-weight:800;text-transform:uppercase;letter-spacing:0.7px;color:#FC4908;margin-bottom:8px;padding-bottom:6px;border-bottom:1px solid rgba(252,73,8,0.2)}\n    .ruwark-schema-col-item{font-size:12px;color:#d1d5db;line-height:1.6;padding:1px 0}\n    @media(max-width:600px){.ruwark-schema-cols{grid-template-columns:1fr}.ruwark-schema-stats{flex-direction:column}}\n    .ruwark-blog-container .ruwark-img-full{display:block;width:100%;height:auto;border-radius:12px;margin:24px 0;border:1px solid rgba(255,255,255,0.06)}\n<\/style>\n\n<div class=\"ruwark-blog-container\">\n    <div class=\"ruwark-card\">\n        <div class=\"ruwark-blog-header\">\n            <span class=\"ruwark-category\">PMAR<\/span>\n            <p class=\"ruwark-blog-title\">Requisitos PMAR sin Infraestructura Preexistente: Gu\u00eda Completa 2026<\/p>\n            <div class=\"ruwark-blog-meta\">\n                <span>\u270d\ufe0f RUWARK S.A.C.<\/span>\n                <span>\ud83d\udcc5 Marzo 2026<\/span>\n                <span>\u23f1\ufe0f 10 min de lectura<\/span>\n            <\/div>\n        <\/div>\n\n        <div class=\"ruwark-blog-body\">\n\n            <div class=\"ruwark-toc\">\n                <p class=\"ruwark-toc-title\">\ud83d\udcd1 Tabla de Contenidos<\/p>\n                <ol>\n                    <li><a href=\"#que-significa\">Qu\u00e9 significa PMAR sin infraestructura preexistente<\/a><\/li>\n                    <li><a href=\"#requisitos-solicitud\">Requisitos de la solicitud (Art. 27.15)<\/a><\/li>\n                    <li><a href=\"#info-tecnica-detalle\">Informaci\u00f3n t\u00e9cnica detallada<\/a><\/li>\n                    <li><a href=\"#plano-perimetrico\">Plano perim\u00e9trico y plano de obras<\/a><\/li>\n                    <li><a href=\"#plazo-resolucion\">Plazo de resoluci\u00f3n: 10 d\u00edas h\u00e1biles<\/a><\/li>\n                    <li><a href=\"#diferencia-infra\">Diferencia con PMAR con infraestructura<\/a><\/li>\n                    <li><a href=\"#checklist-req\">Checklist completo de requisitos<\/a><\/li>\n                    <li><a href=\"#faq-req\">Preguntas frecuentes<\/a><\/li>\n                <\/ol>\n            <\/div>\n\n            <p>Conocer los <strong>requisitos PMAR sin infraestructura preexistente<\/strong> es esencial para presentar un expediente completo ante el Ministerio de Cultura. Este art\u00edculo detalla cada documento y dato t\u00e9cnico exigido por el art\u00edculo 27.15 del RIA, el plazo de 10 d\u00edas h\u00e1biles y las diferencias con otros tipos de PMAR. En <strong>RuwArk S.A.C.<\/strong>, consultora arqueol\u00f3gica en Cusco, preparamos expedientes PMAR que cumplen al 100% con la normativa vigente.<\/p>\n\n            <figure class=\"ruwark-schema-figure\" role=\"img\" aria-label=\"Requisitos PMAR sin infraestructura preexistente datos clave 2026\">\n            <img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/ruwark.com\/wp-content\/uploads\/requisitos-pmar-sin-infra-01.webp\" alt=\"Requisitos PMAR sin infraestructura preexistente solicitud info t\u00e9cnica plazo 10 d\u00edas 2026\" width=\"1\" height=\"1\" loading=\"lazy\" class=\"ruwark-schema-img-hidden\">\n            <div class=\"ruwark-schema\"><div class=\"ruwark-schema-header\"><span class=\"ruwark-schema-hbadge\">ART. 27.15-27.16<\/span><span class=\"ruwark-schema-htitle\">PMAR sin Infraestructura \u2014 Datos Clave<\/span><\/div><div class=\"ruwark-schema-body\"><div class=\"ruwark-schema-stats\"><div class=\"ruwark-schema-stat\"><div class=\"ruwark-schema-stat-num\">10<\/div><div class=\"ruwark-schema-stat-lbl\">D\u00cdAS H\u00c1BILES PLAZO<\/div><\/div><div class=\"ruwark-schema-stat\"><div class=\"ruwark-schema-stat-num\">5<\/div><div class=\"ruwark-schema-stat-lbl\">DOCS ADMINISTRATIVOS<\/div><\/div><div class=\"ruwark-schema-stat\"><div class=\"ruwark-schema-stat-num\">7<\/div><div class=\"ruwark-schema-stat-lbl\">DATOS T\u00c9CNICOS<\/div><\/div><div class=\"ruwark-schema-stat\"><div class=\"ruwark-schema-stat-num\">SAN<\/div><div class=\"ruwark-schema-stat-lbl\">SILENCIO NEGATIVO<\/div><\/div><\/div><\/div><\/div>\n            <\/figure>\n\n\n            <div class=\"ruwark-section\" id=\"que-significa\">\n                <h2 class=\"ruwark-section-title\">1. Qu\u00e9 significa PMAR sin infraestructura preexistente<\/h2>\n                <p>El <strong>PMAR sin infraestructura preexistente<\/strong> es el tipo est\u00e1ndar de Plan de Monitoreo Arqueol\u00f3gico. Se aplica cuando el \u00e1rea del proyecto <strong>no tiene infraestructura existente<\/strong> que necesite ser reconocida documentalmente antes de la autorizaci\u00f3n.<\/p>\n                <p>Este tipo de PMAR corresponde a proyectos nuevos en terrenos sin edificaciones previas, o a obras cuya procedencia arqueol\u00f3gica (CIRAS, PEA, DAS, PRA, PIA) ya est\u00e1 resuelta y no requiere verificaci\u00f3n adicional de infraestructura sobre el terreno.<\/p>\n                <p>Los <strong>requisitos PMAR sin infraestructura preexistente<\/strong> est\u00e1n regulados \u00edntegramente por el art\u00edculo 27.15 del RIA, sin necesidad de documentaci\u00f3n gr\u00e1fica adicional (la cual s\u00ed se exige en el PMAR con infraestructura preexistente, Art. 27.17).<\/p>\n            <\/div>\n\n\n            <div class=\"ruwark-section\" id=\"requisitos-solicitud\">\n                <h2 class=\"ruwark-section-title\">2. Requisitos administrativos de la solicitud<\/h2>\n                <p>El art\u00edculo 27.15 del RIA establece los siguientes documentos administrativos obligatorios:<\/p>\n\n                <table class=\"ruwark-table\">\n                    <thead>\n                        <tr><th>N\u00b0<\/th><th>Requisito<\/th><th>Detalle<\/th><\/tr>\n                    <\/thead>\n                    <tbody>\n                        <tr><td>1<\/td><td><strong>Solicitud con datos generales<\/strong><\/td><td>Nombre o raz\u00f3n social, domicilio, DNI o RUC. Si es persona jur\u00eddica: firma del representante legal y partida registral vigente.<\/td><\/tr>\n                        <tr><td>2<\/td><td><strong>DJ del director y residente<\/strong><\/td><td>N\u00famero de colegiatura COARPE, constancia de habilitaci\u00f3n vigente, compromiso de no afectaci\u00f3n al Patrimonio Cultural.<\/td><\/tr>\n                        <tr><td>3<\/td><td><strong>DJ del titular<\/strong><\/td><td>Compromiso de financiamiento integral del PMAR y de no afectaci\u00f3n al patrimonio cultural.<\/td><\/tr>\n                        <tr><td>4<\/td><td><strong>Acreditaci\u00f3n de titularidad<\/strong><\/td><td>Partida registral del predio, resoluci\u00f3n de adjudicaci\u00f3n, concesi\u00f3n, CUI o documento de leg\u00edtimo inter\u00e9s.<\/td><\/tr>\n                        <tr><td>5<\/td><td><strong>Constancia de pago<\/strong><\/td><td>Comprobante de pago de la tasa de tr\u00e1mite ante la DDC competente.<\/td><\/tr>\n                    <\/tbody>\n                <\/table>\n            <\/div>\n\n\n            <div class=\"ruwark-section\" id=\"info-tecnica-detalle\">\n                <h2 class=\"ruwark-section-title\">3. Informaci\u00f3n t\u00e9cnica detallada del PMAR<\/h2>\n                <p>Adem\u00e1s de los documentos administrativos, los <strong>requisitos PMAR sin infraestructura preexistente<\/strong> incluyen informaci\u00f3n t\u00e9cnica espec\u00edfica:<\/p>\n\n                <figure class=\"ruwark-schema-figure\" role=\"img\" aria-label=\"Informaci\u00f3n t\u00e9cnica requerida para PMAR sin infraestructura seg\u00fan Art. 27.15\">\n                <img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/ruwark.com\/wp-content\/uploads\/requisitos-pmar-sin-infra-02.webp\" alt=\"Requisitos PMAR sin infraestructura preexistente informaci\u00f3n t\u00e9cnica checklist completo\" width=\"1\" height=\"1\" loading=\"lazy\" class=\"ruwark-schema-img-hidden\">\n                <div class=\"ruwark-schema\"><div class=\"ruwark-schema-header\"><span class=\"ruwark-schema-hbadge\">INFO T\u00c9CNICA<\/span><span class=\"ruwark-schema-htitle\">Informaci\u00f3n T\u00e9cnica del PMAR \u2014 Detalle Completo<\/span><\/div><div class=\"ruwark-schema-body\"><div class=\"ruwark-schema-checks\"><div class=\"ruwark-schema-check-row\"><div class=\"ruwark-schema-check-icon\">\u2713<\/div><div class=\"ruwark-schema-check-t\"><strong>Nombre del proyecto:<\/strong> denominaci\u00f3n oficial del proyecto de obra civil<\/div><\/div><div class=\"ruwark-schema-check-row\"><div class=\"ruwark-schema-check-icon\">\u2713<\/div><div class=\"ruwark-schema-check-t\"><strong>Procedencia:<\/strong> indicar de cu\u00e1l supuesto del Art. 27.12 proviene (PIA, PEA, PRA, CIRAS, DAS, etc.)<\/div><\/div><div class=\"ruwark-schema-check-row\"><div class=\"ruwark-schema-check-icon\">\u2713<\/div><div class=\"ruwark-schema-check-t\"><strong>Tipo de obra:<\/strong> clasificaci\u00f3n de la obra civil (edificaci\u00f3n, vial, minera, energ\u00e9tica, etc.)<\/div><\/div><div class=\"ruwark-schema-check-row\"><div class=\"ruwark-schema-check-icon\">\u2713<\/div><div class=\"ruwark-schema-check-t\"><strong>Ubicaci\u00f3n:<\/strong> departamento, provincia, distrito, localidad, coordenadas del centroide<\/div><\/div><div class=\"ruwark-schema-check-row\"><div class=\"ruwark-schema-check-icon\">\u2713<\/div><div class=\"ruwark-schema-check-t\"><strong>Descripci\u00f3n t\u00e9cnica del PMAR:<\/strong> alcances y metodolog\u00eda de monitoreo arqueol\u00f3gico<\/div><\/div><div class=\"ruwark-schema-check-row\"><div class=\"ruwark-schema-check-icon\">\u2713<\/div><div class=\"ruwark-schema-check-t\"><strong>Extensi\u00f3n:<\/strong> superficie total del \u00e1rea a monitorear en hect\u00e1reas o m\u00b2<\/div><\/div><div class=\"ruwark-schema-check-row\"><div class=\"ruwark-schema-check-icon\">\u2713<\/div><div class=\"ruwark-schema-check-t\"><strong>Personal:<\/strong> director + arque\u00f3logos residentes COARPE (1 por frente de trabajo)<\/div><\/div><div class=\"ruwark-schema-check-row\"><div class=\"ruwark-schema-check-icon\">\u2713<\/div><div class=\"ruwark-schema-check-t\"><strong>Cronograma:<\/strong> labores con remoci\u00f3n de suelos, duraci\u00f3n, distribuci\u00f3n de frentes<\/div><\/div><\/div><\/div><\/div>\n                <\/figure>\n\n                <div class=\"ruwark-alert-box\">\n                    <span class=\"alert-title\">\u26a0\ufe0f Cronograma detallado<\/span>\n                    <span class=\"alert-text\">El cronograma es el componente m\u00e1s observado de la informaci\u00f3n t\u00e9cnica. Debe especificar <strong>cada actividad que implique remoci\u00f3n de suelos<\/strong>, su duraci\u00f3n estimada y la distribuci\u00f3n de frentes de trabajo con los arque\u00f3logos residentes asignados a cada uno.<\/span>\n                <\/div>\n            <\/div>\n\n\n            <div class=\"ruwark-section\" id=\"plano-perimetrico\">\n                <h2 class=\"ruwark-section-title\">4. Plano perim\u00e9trico y plano de obras programadas<\/h2>\n\n                <h3 class=\"ruwark-subsection-title\">Plano perim\u00e9trico (obligatorio siempre)<\/h3>\n                <ul>\n                    <li>Formato <strong>.dwg y\/o .shp<\/strong> (archivo digital editable).<\/li>\n                    <li>Georreferenciado en <strong>UTM con Datum WGS 84<\/strong>.<\/li>\n                    <li>Escalas apropiadas, membrete profesional y cuadro de datos t\u00e9cnicos completo.<\/li>\n                    <li>Coordenadas UTM de cada v\u00e9rtice del pol\u00edgono del \u00e1rea a monitorear.<\/li>\n                    <li>Suscrito por profesional competente (ingeniero o top\u00f3grafo colegiado).<\/li>\n                <\/ul>\n\n                <h3 class=\"ruwark-subsection-title\">Plano de obras programadas (condicional)<\/h3>\n                <p>Se requiere \u00fanicamente cuando el proyecto presenta alguna de estas condiciones:<\/p>\n                <ul>\n                    <li>Es <strong>colindante<\/strong> con un Bien Integrante del Patrimonio Cultural (BIP).<\/li>\n                    <li>Tiene <strong>cruce a\u00e9reo<\/strong> sobre un BIP.<\/li>\n                    <li>Pasa por el <strong>subsuelo<\/strong> de un BIP.<\/li>\n                <\/ul>\n\n                <div class=\"ruwark-tip-box\">\n                    <span class=\"tip-title\">\ud83d\udca1 Consejo RUWARK<\/span>\n                    <span class=\"tip-text\">Antes de preparar el plano, consulta el SIGDA para verificar si existen bienes patrimoniales en el entorno del proyecto. Si hay un BIP colindante, prepara ambos planos desde el inicio para evitar retrasos. Consulta nuestra gu\u00eda sobre <a href=\"https:\/\/ruwark.com\/blog\/coordenadas-utm-errores\/\">errores en coordenadas UTM<\/a>.<\/span>\n                <\/div>\n            <\/div>\n\n\n            <div class=\"ruwark-section\" id=\"plazo-resolucion\">\n                <h2 class=\"ruwark-section-title\">5. Plazo de resoluci\u00f3n: 10 d\u00edas h\u00e1biles<\/h2>\n                <p>El art\u00edculo 27.16 del RIA establece que el plazo de calificaci\u00f3n para el PMAR sin infraestructura preexistente es de <strong>10 d\u00edas h\u00e1biles<\/strong>, contados desde el d\u00eda h\u00e1bil posterior a la presentaci\u00f3n de la solicitud completa.<\/p>\n                <p>Este es el plazo m\u00e1s corto de todos los tipos de PMAR. A modo de comparaci\u00f3n, el PMAR con infraestructura preexistente, el subacu\u00e1tico, el de patrimonio posterior al prehisp\u00e1nico y el que proviene de DAS tienen un plazo de <strong>20 d\u00edas h\u00e1biles<\/strong>.<\/p>\n\n                <div class=\"ruwark-alert-box\">\n                    <span class=\"alert-title\">\u26a0\ufe0f Silencio administrativo negativo<\/span>\n                    <span class=\"alert-text\">Si el Ministerio de Cultura no emite resoluci\u00f3n dentro del plazo de 10 d\u00edas h\u00e1biles, la solicitud se considera <strong>denegada<\/strong> por silencio administrativo negativo. Esto implica que debes presentar una nueva solicitud o interponer recurso administrativo.<\/span>\n                <\/div>\n\n                <div class=\"ruwark-success-box\">\n                    <span class=\"success-title\">\u2705 Ventaja del plazo de 10 d\u00edas<\/span>\n                    <span class=\"success-text\">El PMAR sin infraestructura preexistente es el <strong>m\u00e1s r\u00e1pido de autorizar<\/strong>. Si tu proyecto califica para este tipo (sin infraestructura sobre el terreno), puedes obtener la autorizaci\u00f3n en tan solo dos semanas calendario.<\/span>\n                <\/div>\n            <\/div>\n\n\n            <div class=\"ruwark-section\" id=\"diferencia-infra\">\n                <h2 class=\"ruwark-section-title\">6. Diferencia con el PMAR con infraestructura preexistente<\/h2>\n                <p>Es fundamental entender la diferencia entre los <strong>requisitos PMAR sin infraestructura preexistente<\/strong> y los del PMAR con infraestructura, ya que confundir ambos puede generar observaciones:<\/p>\n\n                <table class=\"ruwark-table\">\n                    <thead>\n                        <tr><th>Aspecto<\/th><th>Sin infraestructura<\/th><th>Con infraestructura<\/th><\/tr>\n                    <\/thead>\n                    <tbody>\n                        <tr><td><strong>Base normativa<\/strong><\/td><td>Art. 27.15 y 27.16<\/td><td>Art. 27.15 + 27.17 y 27.18<\/td><\/tr>\n                        <tr><td><strong>Requisitos base<\/strong><\/td><td>Solicitud + DJ + titularidad + pago + info t\u00e9cnica + plano<\/td><td>Los mismos + documentaci\u00f3n gr\u00e1fica<\/td><\/tr>\n                        <tr><td><strong>Doc. gr\u00e1fica<\/strong><\/td><td>No requerida<\/td><td>Fotograf\u00edas panor\u00e1micas, detalles, im\u00e1genes satelitales con fecha, hora y coordenadas UTM<\/td><\/tr>\n                        <tr><td><strong>Plazo<\/strong><\/td><td><strong>10 d\u00edas h\u00e1biles<\/strong><\/td><td>20 d\u00edas h\u00e1biles<\/td><\/tr>\n                        <tr><td><strong>Verificaci\u00f3n<\/strong><\/td><td>Documental<\/td><td>Documentaci\u00f3n o inspecci\u00f3n por DCIA\/DDC (Art. 27.8)<\/td><\/tr>\n                        <tr><td><strong>Silencio adm.<\/strong><\/td><td>Negativo<\/td><td>Negativo<\/td><\/tr>\n                    <\/tbody>\n                <\/table>\n            <\/div>\n\n\n            <div class=\"ruwark-section\" id=\"checklist-req\">\n                <h2 class=\"ruwark-section-title\">7. Checklist completo de requisitos PMAR<\/h2>\n\n                <figure class=\"ruwark-schema-figure\" role=\"img\" aria-label=\"Checklist completo requisitos PMAR sin infraestructura preexistente\">\n                <img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/ruwark.com\/wp-content\/uploads\/requisitos-pmar-sin-infra-03.webp\" alt=\"Checklist requisitos PMAR sin infraestructura preexistente documentaci\u00f3n y planos 2026\" width=\"1\" height=\"1\" loading=\"lazy\" class=\"ruwark-schema-img-hidden\">\n                <div class=\"ruwark-schema\"><div class=\"ruwark-schema-header\"><span class=\"ruwark-schema-hbadge\">CHECKLIST<\/span><span class=\"ruwark-schema-htitle\">Requisitos PMAR sin Infraestructura \u2014 Lista Completa<\/span><\/div><div class=\"ruwark-schema-body\"><div class=\"ruwark-schema-cols\"><div class=\"ruwark-schema-col\"><div class=\"ruwark-schema-col-head\">Documentaci\u00f3n Administrativa<\/div><div class=\"ruwark-schema-col-item\">\u2713 Solicitud con datos generales<\/div><div class=\"ruwark-schema-col-item\">\u2713 DJ del director y residente (COARPE)<\/div><div class=\"ruwark-schema-col-item\">\u2713 DJ del titular del proyecto<\/div><div class=\"ruwark-schema-col-item\">\u2713 Acreditaci\u00f3n de titularidad<\/div><div class=\"ruwark-schema-col-item\">\u2713 Constancia de pago (DDC)<\/div><\/div><div class=\"ruwark-schema-col\"><div class=\"ruwark-schema-col-head\">Info T\u00e9cnica + Plano<\/div><div class=\"ruwark-schema-col-item\">\u2713 Nombre del proyecto<\/div><div class=\"ruwark-schema-col-item\">\u2713 Procedencia (Art. 27.12)<\/div><div class=\"ruwark-schema-col-item\">\u2713 Tipo de obra y ubicaci\u00f3n<\/div><div class=\"ruwark-schema-col-item\">\u2713 Descripci\u00f3n t\u00e9cnica del PMAR<\/div><div class=\"ruwark-schema-col-item\">\u2713 Extensi\u00f3n + personal + cronograma<\/div><div class=\"ruwark-schema-col-item\">\u2713 Plano .dwg\/.shp WGS84<\/div><div class=\"ruwark-schema-col-item\">\u2713 Plano obras programadas (si BIP)<\/div><\/div><\/div><\/div><\/div>\n                <\/figure>\n            <\/div>\n\n\n            <div class=\"ruwark-section\" id=\"faq-req\">\n                <h2 class=\"ruwark-section-title\">8. Preguntas frecuentes<\/h2>\n                <div class=\"ruwark-faq\">\n                    <div class=\"ruwark-faq-item\">\n                        <h3 class=\"ruwark-faq-question\"><span class=\"q-icon\">\u2753<\/span> \u00bfCu\u00e1l es el plazo para la autorizaci\u00f3n del PMAR sin infraestructura?<\/h3>\n                        <p class=\"ruwark-faq-answer\"><strong>10 d\u00edas h\u00e1biles<\/strong> contados desde la presentaci\u00f3n de la solicitud completa (Art. 27.16 RIA). Se sujeta a silencio administrativo negativo.<\/p>\n                    <\/div>\n                    <div class=\"ruwark-faq-item\">\n                        <h3 class=\"ruwark-faq-question\"><span class=\"q-icon\">\u2753<\/span> \u00bfQu\u00e9 documentos administrativos se necesitan para el PMAR?<\/h3>\n                        <p class=\"ruwark-faq-answer\">Solicitud con datos generales, DJ del director y residente, DJ del titular, acreditaci\u00f3n de titularidad y constancia de pago (Art. 27.15 RIA).<\/p>\n                    <\/div>\n                    <div class=\"ruwark-faq-item\">\n                        <h3 class=\"ruwark-faq-question\"><span class=\"q-icon\">\u2753<\/span> \u00bfQu\u00e9 debe incluir la informaci\u00f3n t\u00e9cnica del PMAR?<\/h3>\n                        <p class=\"ruwark-faq-answer\">Nombre del proyecto, procedencia, tipo de obra, ubicaci\u00f3n, descripci\u00f3n del PMAR, extensi\u00f3n, personal, <strong>cronograma con labores de remoci\u00f3n de suelos<\/strong> y distribuci\u00f3n de frentes.<\/p>\n                    <\/div>\n                    <div class=\"ruwark-faq-item\">\n                        <h3 class=\"ruwark-faq-question\"><span class=\"q-icon\">\u2753<\/span> \u00bfCu\u00e1ndo se requiere el plano de obras programadas?<\/h3>\n                        <p class=\"ruwark-faq-answer\">Solo cuando el proyecto es colindante, tiene cruce a\u00e9reo o pasa por subsuelo de un <strong>BIP<\/strong>. En los dem\u00e1s casos basta con el plano perim\u00e9trico .dwg\/.shp WGS84.<\/p>\n                    <\/div>\n                    <div class=\"ruwark-faq-item\">\n                        <h3 class=\"ruwark-faq-question\"><span class=\"q-icon\">\u2753<\/span> \u00bfQu\u00e9 diferencia al PMAR sin infraestructura del PMAR con infraestructura?<\/h3>\n                        <p class=\"ruwark-faq-answer\">El PMAR con infraestructura requiere <strong>documentaci\u00f3n gr\u00e1fica adicional<\/strong> (fotograf\u00edas, im\u00e1genes satelitales con fecha\/hora\/coordenadas) y tiene un plazo de 20 d\u00edas h\u00e1biles en lugar de 10 (Art. 27.17-27.18).<\/p>\n                    <\/div>\n                <\/div>\n            <\/div>\n\n\n            <div class=\"ruwark-section\">\n                <h2 class=\"ruwark-section-title\">9. Prepara tu expediente PMAR con RuwArk<\/h2>\n                <p>Cumplir con todos los <strong>requisitos PMAR sin infraestructura preexistente<\/strong> desde el primer intento ahorra tiempo y dinero. En <strong>RuwArk S.A.C.<\/strong>, elaboramos expedientes que pasan la calificaci\u00f3n sin observaciones, con planos georreferenciados y cronogramas t\u00e9cnicamente sustentados.<\/p>\n            <\/div>\n\n            <div class=\"ruwark-cta\">\n                <p class=\"cta-title\">\u00bfNecesitas preparar tu expediente PMAR?<\/p>\n                <p class=\"cta-text\">Te ayudamos a reunir todos los requisitos y presentar un expediente impecable ante el Ministerio de Cultura.<\/p>\n                <a href=\"https:\/\/ruwark.com\/contacto\/\" class=\"cta-button\">\ud83d\udcde Cotiza tu PMAR<\/a>\n            <\/div>\n\n            <div class=\"ruwark-tip-box\">\n                <span class=\"tip-title\">\ud83d\udcda Art\u00edculos relacionados<\/span>\n                <span class=\"tip-text\">\n                    \u2192 <a href=\"https:\/\/ruwark.com\/blog\/pmar-infraestructura-preexistente\/\">PMAR con Infraestructura: Requisitos 2026<\/a><br>\n                    \u2192 <a href=\"https:\/\/ruwark.com\/blog\/como-tramitar-pmar-guia\/\">C\u00f3mo Tramitar un PMAR: Gu\u00eda Paso a Paso<\/a><br>\n                    \u2192 <a href=\"https:\/\/ruwark.com\/blog\/plazos-pmar-tipos-autorizacion\/\">Plazos PMAR: 10 vs 20 D\u00edas H\u00e1biles<\/a>\n                <\/span>\n            <\/div>\n\n            <div class=\"ruwark-sources\">\n                <p class=\"sources-title\">\ud83d\udcd6 Fuentes y referencias normativas<\/p>\n                <ul>\n                    <li><a href=\"https:\/\/www.gob.pe\/institucion\/cultura\/normas-legales\" target=\"_blank\" rel=\"noopener\">D.S. N\u00b0 011-2022-MC \u2014 Reglamento de Intervenciones Arqueol\u00f3gicas (RIA)<\/a><\/li>\n                    <li><a href=\"https:\/\/www.gob.pe\/institucion\/cultura\/normas-legales\" target=\"_blank\" rel=\"noopener\">D.S. N\u00b0 004-2025-MC \u2014 Modificaci\u00f3n del RIA<\/a><\/li>\n                    <li><a href=\"https:\/\/www.gob.pe\/cultura\" target=\"_blank\" rel=\"noopener\">Ministerio de Cultura del Per\u00fa \u2014 Portal oficial<\/a><\/li>\n                <\/ul>\n            <\/div>\n        <\/div>\n    <\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>PMAR Requisitos PMAR sin Infraestructura Preexistente: Gu\u00eda Completa 2026 \u270d\ufe0f RUWARK S.A.C. \ud83d\udcc5 Marzo 2026 \u23f1\ufe0f 10 min de lectura \ud83d\udcd1 Tabla de Contenidos Qu\u00e9 significa PMAR sin infraestructura preexistente Requisitos de la solicitud (Art. 27.15) Informaci\u00f3n t\u00e9cnica detallada Plano perim\u00e9trico y plano de obras Plazo de resoluci\u00f3n: 10 d\u00edas h\u00e1biles Diferencia con PMAR con [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6760,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rank_math_focus_keyword":"Requisitos","rank_math_description":"","rank_math_title":"","rank_math_canonical_url":"","footnotes":""},"categories":[6],"tags":[18],"class_list":["post-6759","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pmar","tag-pmar"],"_links":{"self":[{"href":"https:\/\/ruwark.com\/blog\/wp-json\/wp\/v2\/posts\/6759","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ruwark.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ruwark.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ruwark.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ruwark.com\/blog\/wp-json\/wp\/v2\/comments?post=6759"}],"version-history":[{"count":1,"href":"https:\/\/ruwark.com\/blog\/wp-json\/wp\/v2\/posts\/6759\/revisions"}],"predecessor-version":[{"id":6761,"href":"https:\/\/ruwark.com\/blog\/wp-json\/wp\/v2\/posts\/6759\/revisions\/6761"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ruwark.com\/blog\/wp-json\/wp\/v2\/media\/6760"}],"wp:attachment":[{"href":"https:\/\/ruwark.com\/blog\/wp-json\/wp\/v2\/media?parent=6759"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ruwark.com\/blog\/wp-json\/wp\/v2\/categories?post=6759"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ruwark.com\/blog\/wp-json\/wp\/v2\/tags?post=6759"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}